Days 60-62, brings lots of finishing work. Windows need to be installed into interior walls in the Kitchen and Dining Rooms.
Below, Darrell prepares to add more structure to the fireplace pedestal to accommodate a 16" slab to sit during those cold Winter days. The paper taped to the wall ask him to find the hidden outlet covered by sheetrock.
Darrell and Stacy work to square the window into the opening.
Keeping everything level is a real trick and separate these builders from the rest of the pack.
Darrel starts to install the door to the patio and mud room. Builders have a lot of special tools to complete their various tasks.
We have yet to solution our entertainment console to store all the components and our collection of DVD's. Paul has provide an articulating stand that pulls out and rotates 90 degrees to reveal all your rear panel connections without reaching behind the equipment.
Victor suck on a candy stick while cutting in the paint walls before the builder add the new trim caps around the stairwell
This show Stacy and Darrell after much angling. They figured out the best way to get the Family room door jam with two side lights into the house.
Now the guys clean up after a long day of getting window and door frame to fit in their assigned opening and get leveled into their new location.
This owner took off Friday to attend the "Legends of the Autobahn" in Camel Valley in his own legend, a 1999 Porsche 911 Cabriolet. That event was followed by two days of historic car races and 6oth year anniversary of the Chevrolet Corvette at the Laguna Seca Raceway.
NEXT: The cabinets arrived, well the first load. There another truck load tomorrow.