With final inspection behind us the to-do list is shrinking. One of the unmentioned tasks is the clean-up process performed by Michelle and son, Kyle. She also spots things still needing to be fixed.
Michelle was very busy spotting all the areas where the baseboard was installed and painted. She has a trained eye for any holidays.
RIGHT, Kyle has shown us how to tighten the dusting mop. We couldn't figure out how to lock the pole in the correct position.
BELOW, Michelle is cutting back the paper floor covering the hardwood floor and taping the edges down so it does not become a trip hazard.
Michelle and Clint are busy checking out the stained and lacquered closet doors.
RIGHT, Michelle and Kyle have gathered all the paper and stuff a box with all left overs.
Our plumber, Brad didn't like the way our hydronics heating system was functioning.
We had his colleague come and see what the problems was.
The circulation pumb had failed and we caught it in the nick of time.
BELOW, Michelle is recording some of the remodeling areas. Both Darrell and Michelle should be very proud of the work they have accomplished in bringing our dreams and designs to a finished state.
We are still searching for the right look with the plaster wall.Clint wants it to wow us...
Thanks I know we will get there.
Ever want to know how to check a 9 volt battery? just ask Brad the plumber. I wonder if Mikey taught him that to test them with his tongue?
B E N
June 13, 2002 to October 25, 2013
It is with a sad heart that Ben had to be put down a at 2:00pm this afternoon. He had a tumor which was bleeding internally causing Ben to black out. Sandy and I drove him to the vets where we were advised of his condition. We were both present when Ben pasted. It is sad to lose him. He was just getting to know our new dog, Pixar.
We are now a two dog household.
LOVE YOU BEN!
No comments:
Post a Comment